Bernie Cahill Jaime Murray
Case #227035[email protected]
Stage
estimate pending
Urgency
soon
Sensitivity
standard
Assigned
Unassigned
Licensee
Case Overview
estimate pending
—
Unassigned
—
—
—
Bill scheduled a walk-through for Monday 9/14/26 at 10am. Single Family - 2 FL 4bd 4ba - 3471sqft - built 1955- $5.394,600 9/14/26 We met Jaime & Tanko (dog) Bill will email their blueprint & any scope changes to the group All companies bidding project ; Zeek & Josh - GC MedViro - Accurate - Blue Earth First 1/3 of the crawlspace has no ventilation and access is outside. It extends from the entryway to the kitchen and the length of the hallway. The other 2/3 of the crawlspace is accessed from the panel in the hallway and is ventilated. It extends from the kitchen to the south wall. Basement systems is a fractured franchise, ex; Saber. They treat vapor barriers with the antimicrobial in the material. Kitchen is being completely gutted, dispose of all materials. Remove ceiling drywall left of the chandelier and all drywall floor to ceiling around to the south wall. The wine cellar is being removed. All wood flooring removed. Theater couch, carpet, wall and ceiling covering will be removed prior to remediation. The chandelier should remain as an open item. Hall bathroom, toilet, and vanity to be detached and preserved. Gut first floor bathrooms, preserve vanities and toilets. Primary closet and adjacent shower wall shows water damage - flood cut by shower and tub - remove drywall from floor up 4ft, not removing the flooring. Primary closet remove drywall 4ft up on the east and north wall. Bill’s notes; Lead and Asbestos testing have NOT been performed. It would be best to include an allowance for these services and a caveat that your estimate does not include any hazardous materials abatement. It is highly unlikely that there is lead or asbestos due to the recent extensive work performed throughout the house, but you cannot be sure without verification! Matterport Link - I have attached the email which provides a link to the files from the architect for you viewing pleasure. I don’t believe there is a link attached so if there isn’t, please feel free to contact me or the architect directly. For the Primary Shower, there is water damage to both sides of the tile enclosure. Remove a 24”x24” section of wallboard and insulation from both ends and provide AVELAR with documented findings. In the Primary closet behind the double vanity, the closet organizer will need to be detached to access the wallboard removal in the closet. All drywall and insulation removal upstairs will be 48” high and the cavities cleaned. HVAC unit in downstairs HVAC closet. In order to facilitate the drywall removal from floor to ceiling in the HVAC closet, the air handling unit will need to be decommissioned and removed. At that time, all ducting ends will need to be capped. At the end of the project, there should be an allowance for the cleaning of the entire system, including the ducting. Added removals downstairs in the family room/kitchen now includes the drywall and insulation from floor to ceiling where the wine cellar is, the entire kitchen and the rear elevation exterior facing wall. In the kitchen, all cabinets and island will be removed and disposed. The ceiling wallboard and insulation will be removed in the kitchen from the left elevation and extending to the dining table light fixture. The sheathing, framing and upstairs subfloor will need to be remediated in the same fashion as all opened areas and small particle cleaned in the same fashion as the whole house. The Theater Room. For bidding purposes, the understanding is that the sofa and the carpet will be removed prior to remediation. The chandelier should remain as an open item. Contents. Assume the house will be empty inclusive of electronics.